Glenayr Childcare Centre
Extension, additional level, refurbishment and fit out to the existing centre, over the Christmas period.
- CONSTRUCTION COST: $1.1 million
- CLIENT: Moriah College
- CLIENT REPRESENTATIVE: Toby Wetherill
Extension, additional level, refurbishment and fit out to the existing centre, over the Christmas period.