Mining Engineering Building, UNSW

Internal refurbishment and façade works over the two levels, whilst the building was occupied.

  • CONSTRUCTION COST: $1.5 million
  • CLIENT: University of NSW
  • CLIENT REPRESENTATIVE: Mark Field