Mining Engineering Building, UNSW
Internal refurbishment and façade works over the two levels, whilst the building was occupied.
- CONSTRUCTION COST: $1.5 million
- CLIENT: University of NSW
- CLIENT REPRESENTATIVE: Mark Field
Internal refurbishment and façade works over the two levels, whilst the building was occupied.